2025 Q3-rapport
56 dagar sedan29min
Orderdjup
Euronext Growth Oslo
Antal
Köp
230
Sälj
Antal
21 017
Senaste avslut
| Tid | Pris | Antal | Köpare | Säljare |
|---|---|---|---|---|
| 43 | - | - | ||
| 350 | - | - | ||
| 2 000 | - | - | ||
| 50 000 | - | - | ||
| 20 377 | - | - |
Högst
2,39VWAP
Lägst
2,26OmsättningAntal
0,5 197 506
VWAP
Högst
2,39Lägst
2,26OmsättningAntal
0,5 197 506
Mäklarstatistik
Ingen data hittades
Företagshändelser
Data hämtas från FactSet, Quartr| Nästa händelse | |
|---|---|
| 2025 Q4-rapport | 10 mars |
| Tidigare händelser | ||
|---|---|---|
| 2025 Q3-rapport | 10 dec. 2025 | |
| 2025 Q2-rapport | 30 sep. 2025 | |
| 2025 Q1-rapport | 26 juni 2025 | |
| 2024 Q4-rapport | 27 mars 2025 | |
| 2024 Q3-rapport | 10 dec. 2024 |
Kunder har även besökt
Shareville
Delta i diskussionerna på SharevilleFå inspiration från tusentals portföljer och diskutera med andra duktiga investerare.
Logga in
- ·för 1 tim sedanInte säkert alla är medvetna om det, men Akobo säljer sitt guld med en premium på 15% i förhållande till spot. Spotpris är för 24karat och Akobo levererar strax under 23karat. Priset de får är spot minus 10%, men så får de ca 15% på det priset igen. Så det priset de får betalt. ((5000*0,9)*1,15))= 5175$/oz. De får betalt i lokal valuta.
- ·för 21 tim sedanOm Akobo mycket snart kan visa att något kommer att ge dem mycket bättre skuldbetingelser än dagens ränta 22%, ja då kommer det fortfarande att finnas hopp i hängande snöre 😊
- ·för 23 tim sedanGuld har återhämtat sig lite igen (4900$). Guld kommer nog att svänga framöver, men om guld håller sig över 4000$ ska akobo vara mycket nöjd. Produktions- och framstegsuppdatering kommer kanske på Fredag, om inte blir det nästa vecka.
- ·för 2 dagar sedanhttps://www.finansavisen.no/industri/2026/02/01/8324976/milliardsalg-av-gruver-etter-gullhopp Med joru i drift borde akobo också bli intressant för uppköp.
- ·30 jan.Full kollaps för guldpriset nu ner 11,5% nuför 1 dag sedanför 1 dag sedanup Vertical shaft project advanced – design and budget approved; shaft team mobilised Headgear fabrication commenced ■ ■ ■ ■ Two new shaking tables installed and commissioned Ethiopian Investment Holdings (EIH) invested USD 3 million Monetary Metals loan restructured – interest reduced and grace period extended to February 2026 Gold prices remained strong, supporting stable cash-flow potential POST-PERIOD DEVELOPMENTS Following the quarter end, operational progress and market conditions remained favourable: ■ ■ ■ ■ Stable production in October and November of approximately 13.5 kg at an average grade of 21.0 g/t, with an estimated value of ~USD 1.9 million Cash and unsold gold position remained strong, with a combined value of approximately USD 4.3 million at the end of November Cumulative production reached approximately 65 kg since start-up ROM stockpile increased to 385 tons, providing a strong operational buffer ahead of shaft commissioning; at an assumed grade of 20 g/t, this corresponds to an indicative in-situ value of approximately USD 1.1 million (not recognised in the accounts) ■ ■ ■ ■ ■ ■ ■ Gold prices reached new all-time highs, strengthening future revenue potential Headgear fabrication was completed and the structure shipped from the assembly site Vertical shaft advanced to 20 metres into hard rock, out of a planned 60 metres Infrastructure works for the headgear base commenced, enabling concrete foundation preparation Installation of two water treatment plants continued, improving both process-water supply and potable water availability on site Camp upgrades progressed, enhancing accommodation capacity and general facilities All remaining convertible bonds were converted into shares after the reporting period AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 5 5 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 6 FINANCIAL REVIEW All figures in SEK million Q3 2025 YTD 2025 Revenue 22.9 36.9 EBITDA 6.9 -6.1 Cash Flow 24.1 2.2 Cash at end of period 31.2 Total Equity -192.4 Long-term Debt 392.0 *Q3 2025 report not reconciled with the 2024 annual accounts exchange rate adjustments
Kommentarerna ovan kommer från användare på Nordnets sociala nätverk Shareville och har varken redigerats eller på förhand granskats av Nordnet. Det innebär inte att Nordnet tillhandahåller investeringsrådgivning eller investeringsrekommendationer. Nordnet påtar sig inget ansvar för kommentarerna eller eventuella felaktigheter i automatiska översättningar.
Nyheter
Nyheter och/eller generella investeringsrekommendationer alternativt utdrag därav på denna sida och relaterade länkar är framtagna och tillhandahålls av den leverantör som anges. Nordnet har inte medverkat till framtagandet, granskar inte och har inte gjort några ändringar i materialet. Läs mer om investeringsrekommendationer.
2025 Q3-rapport
56 dagar sedan29min
Nyheter
Nyheter och/eller generella investeringsrekommendationer alternativt utdrag därav på denna sida och relaterade länkar är framtagna och tillhandahålls av den leverantör som anges. Nordnet har inte medverkat till framtagandet, granskar inte och har inte gjort några ändringar i materialet. Läs mer om investeringsrekommendationer.
Shareville
Delta i diskussionerna på SharevilleFå inspiration från tusentals portföljer och diskutera med andra duktiga investerare.
Logga in
- ·för 1 tim sedanInte säkert alla är medvetna om det, men Akobo säljer sitt guld med en premium på 15% i förhållande till spot. Spotpris är för 24karat och Akobo levererar strax under 23karat. Priset de får är spot minus 10%, men så får de ca 15% på det priset igen. Så det priset de får betalt. ((5000*0,9)*1,15))= 5175$/oz. De får betalt i lokal valuta.
- ·för 21 tim sedanOm Akobo mycket snart kan visa att något kommer att ge dem mycket bättre skuldbetingelser än dagens ränta 22%, ja då kommer det fortfarande att finnas hopp i hängande snöre 😊
- ·för 23 tim sedanGuld har återhämtat sig lite igen (4900$). Guld kommer nog att svänga framöver, men om guld håller sig över 4000$ ska akobo vara mycket nöjd. Produktions- och framstegsuppdatering kommer kanske på Fredag, om inte blir det nästa vecka.
- ·för 2 dagar sedanhttps://www.finansavisen.no/industri/2026/02/01/8324976/milliardsalg-av-gruver-etter-gullhopp Med joru i drift borde akobo också bli intressant för uppköp.
- ·30 jan.Full kollaps för guldpriset nu ner 11,5% nuför 1 dag sedanför 1 dag sedanup Vertical shaft project advanced – design and budget approved; shaft team mobilised Headgear fabrication commenced ■ ■ ■ ■ Two new shaking tables installed and commissioned Ethiopian Investment Holdings (EIH) invested USD 3 million Monetary Metals loan restructured – interest reduced and grace period extended to February 2026 Gold prices remained strong, supporting stable cash-flow potential POST-PERIOD DEVELOPMENTS Following the quarter end, operational progress and market conditions remained favourable: ■ ■ ■ ■ Stable production in October and November of approximately 13.5 kg at an average grade of 21.0 g/t, with an estimated value of ~USD 1.9 million Cash and unsold gold position remained strong, with a combined value of approximately USD 4.3 million at the end of November Cumulative production reached approximately 65 kg since start-up ROM stockpile increased to 385 tons, providing a strong operational buffer ahead of shaft commissioning; at an assumed grade of 20 g/t, this corresponds to an indicative in-situ value of approximately USD 1.1 million (not recognised in the accounts) ■ ■ ■ ■ ■ ■ ■ Gold prices reached new all-time highs, strengthening future revenue potential Headgear fabrication was completed and the structure shipped from the assembly site Vertical shaft advanced to 20 metres into hard rock, out of a planned 60 metres Infrastructure works for the headgear base commenced, enabling concrete foundation preparation Installation of two water treatment plants continued, improving both process-water supply and potable water availability on site Camp upgrades progressed, enhancing accommodation capacity and general facilities All remaining convertible bonds were converted into shares after the reporting period AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 5 5 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 6 FINANCIAL REVIEW All figures in SEK million Q3 2025 YTD 2025 Revenue 22.9 36.9 EBITDA 6.9 -6.1 Cash Flow 24.1 2.2 Cash at end of period 31.2 Total Equity -192.4 Long-term Debt 392.0 *Q3 2025 report not reconciled with the 2024 annual accounts exchange rate adjustments
Kommentarerna ovan kommer från användare på Nordnets sociala nätverk Shareville och har varken redigerats eller på förhand granskats av Nordnet. Det innebär inte att Nordnet tillhandahåller investeringsrådgivning eller investeringsrekommendationer. Nordnet påtar sig inget ansvar för kommentarerna eller eventuella felaktigheter i automatiska översättningar.
Orderdjup
Euronext Growth Oslo
Antal
Köp
230
Sälj
Antal
21 017
Senaste avslut
| Tid | Pris | Antal | Köpare | Säljare |
|---|---|---|---|---|
| 43 | - | - | ||
| 350 | - | - | ||
| 2 000 | - | - | ||
| 50 000 | - | - | ||
| 20 377 | - | - |
Högst
2,39VWAP
Lägst
2,26OmsättningAntal
0,5 197 506
VWAP
Högst
2,39Lägst
2,26OmsättningAntal
0,5 197 506
Mäklarstatistik
Ingen data hittades
Kunder har även besökt
Företagshändelser
Data hämtas från FactSet, Quartr| Nästa händelse | |
|---|---|
| 2025 Q4-rapport | 10 mars |
| Tidigare händelser | ||
|---|---|---|
| 2025 Q3-rapport | 10 dec. 2025 | |
| 2025 Q2-rapport | 30 sep. 2025 | |
| 2025 Q1-rapport | 26 juni 2025 | |
| 2024 Q4-rapport | 27 mars 2025 | |
| 2024 Q3-rapport | 10 dec. 2024 |
2025 Q3-rapport
56 dagar sedan29min
Nyheter
Nyheter och/eller generella investeringsrekommendationer alternativt utdrag därav på denna sida och relaterade länkar är framtagna och tillhandahålls av den leverantör som anges. Nordnet har inte medverkat till framtagandet, granskar inte och har inte gjort några ändringar i materialet. Läs mer om investeringsrekommendationer.
Företagshändelser
Data hämtas från FactSet, Quartr| Nästa händelse | |
|---|---|
| 2025 Q4-rapport | 10 mars |
| Tidigare händelser | ||
|---|---|---|
| 2025 Q3-rapport | 10 dec. 2025 | |
| 2025 Q2-rapport | 30 sep. 2025 | |
| 2025 Q1-rapport | 26 juni 2025 | |
| 2024 Q4-rapport | 27 mars 2025 | |
| 2024 Q3-rapport | 10 dec. 2024 |
Shareville
Delta i diskussionerna på SharevilleFå inspiration från tusentals portföljer och diskutera med andra duktiga investerare.
Logga in
- ·för 1 tim sedanInte säkert alla är medvetna om det, men Akobo säljer sitt guld med en premium på 15% i förhållande till spot. Spotpris är för 24karat och Akobo levererar strax under 23karat. Priset de får är spot minus 10%, men så får de ca 15% på det priset igen. Så det priset de får betalt. ((5000*0,9)*1,15))= 5175$/oz. De får betalt i lokal valuta.
- ·för 21 tim sedanOm Akobo mycket snart kan visa att något kommer att ge dem mycket bättre skuldbetingelser än dagens ränta 22%, ja då kommer det fortfarande att finnas hopp i hängande snöre 😊
- ·för 23 tim sedanGuld har återhämtat sig lite igen (4900$). Guld kommer nog att svänga framöver, men om guld håller sig över 4000$ ska akobo vara mycket nöjd. Produktions- och framstegsuppdatering kommer kanske på Fredag, om inte blir det nästa vecka.
- ·för 2 dagar sedanhttps://www.finansavisen.no/industri/2026/02/01/8324976/milliardsalg-av-gruver-etter-gullhopp Med joru i drift borde akobo också bli intressant för uppköp.
- ·30 jan.Full kollaps för guldpriset nu ner 11,5% nuför 1 dag sedanför 1 dag sedanup Vertical shaft project advanced – design and budget approved; shaft team mobilised Headgear fabrication commenced ■ ■ ■ ■ Two new shaking tables installed and commissioned Ethiopian Investment Holdings (EIH) invested USD 3 million Monetary Metals loan restructured – interest reduced and grace period extended to February 2026 Gold prices remained strong, supporting stable cash-flow potential POST-PERIOD DEVELOPMENTS Following the quarter end, operational progress and market conditions remained favourable: ■ ■ ■ ■ Stable production in October and November of approximately 13.5 kg at an average grade of 21.0 g/t, with an estimated value of ~USD 1.9 million Cash and unsold gold position remained strong, with a combined value of approximately USD 4.3 million at the end of November Cumulative production reached approximately 65 kg since start-up ROM stockpile increased to 385 tons, providing a strong operational buffer ahead of shaft commissioning; at an assumed grade of 20 g/t, this corresponds to an indicative in-situ value of approximately USD 1.1 million (not recognised in the accounts) ■ ■ ■ ■ ■ ■ ■ Gold prices reached new all-time highs, strengthening future revenue potential Headgear fabrication was completed and the structure shipped from the assembly site Vertical shaft advanced to 20 metres into hard rock, out of a planned 60 metres Infrastructure works for the headgear base commenced, enabling concrete foundation preparation Installation of two water treatment plants continued, improving both process-water supply and potable water availability on site Camp upgrades progressed, enhancing accommodation capacity and general facilities All remaining convertible bonds were converted into shares after the reporting period AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 5 5 AKOBO MINERALS AB (publ) — THIRD QUARTER REPORT 2025 6 FINANCIAL REVIEW All figures in SEK million Q3 2025 YTD 2025 Revenue 22.9 36.9 EBITDA 6.9 -6.1 Cash Flow 24.1 2.2 Cash at end of period 31.2 Total Equity -192.4 Long-term Debt 392.0 *Q3 2025 report not reconciled with the 2024 annual accounts exchange rate adjustments
Kommentarerna ovan kommer från användare på Nordnets sociala nätverk Shareville och har varken redigerats eller på förhand granskats av Nordnet. Det innebär inte att Nordnet tillhandahåller investeringsrådgivning eller investeringsrekommendationer. Nordnet påtar sig inget ansvar för kommentarerna eller eventuella felaktigheter i automatiska översättningar.
Orderdjup
Euronext Growth Oslo
Antal
Köp
230
Sälj
Antal
21 017
Senaste avslut
| Tid | Pris | Antal | Köpare | Säljare |
|---|---|---|---|---|
| 43 | - | - | ||
| 350 | - | - | ||
| 2 000 | - | - | ||
| 50 000 | - | - | ||
| 20 377 | - | - |
Högst
2,39VWAP
Lägst
2,26OmsättningAntal
0,5 197 506
VWAP
Högst
2,39Lägst
2,26OmsättningAntal
0,5 197 506
Mäklarstatistik
Ingen data hittades





